Jimmy Key Arena Re-roof - $80.000.00
The design challenge for Aegis Building Sciences on this project was to design a
roof system that was lightweight, durable and most important, not endanger the
building with a thermally installed roof system. The solution was to specify a
cold applied modified bitumen system. As no open flame torches were used in the
installation of the roof system there was no threat to the highly combustible
structure.
CANADIAN FORCES BASE BORDEN
Performed major roof survey including infrared scan to reveal areas of moisture
containing insulation. Survey revealed a dangerously overloaded roof system.
Report contained list of recommended repairs and budgetary costs for executing
repairs and replacement. All information presented in INFOROOF format including
hard copy and digital copy.
SEARS CANADA
OSHAWA RE-ROOF $421,000
This major reroofing project involved the removal of the existing roof system
and replacement while the facility remained in operation. The roofing solution
as proposed by Aegis Building Sciences was install a modified bitumen roofing
system that did not use hot asphalt and its associated fumes. The modified
bitumen system utilized a self adhesive base sheet and a torched applied cap
sheet. This technology resulted in a durable roof system that did not disrupt
the operation of the bidding during installation.
MAGNA INTERNATIONAL
TILLSONBURG FACILITY RE-ROOF $900.000.00
Winter 1997
This major reroofing project involved the removal of the existing roof system
and installation of a new roof system. The project was executed during the
winter months and a high quality installation with an extended warranty was
delivered.